KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  1-28-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Baffle prep - airbox fram

Fabricaed the frame for the filter airbox that will mount to a front ramp of the baffle set. Drilling and final assembly will happen when the baffles go in.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.