Powered By Kitlog Pro v2.0
RV-7
RV-7
Finishing
2-27-2016
< Previous Log Entry
Next Log Entry >
Date:
2-27-2016
Number of Hours:
9.00
Manual Reference:
Brief Description:
Pump cover and canopy bearing blocks
Fit check fuel pump cover and tunnel ... looking good.
Fabricated bearing blocks for the canopy hinges. Ground the pins to size; located the block, and carefuly drilld them to the forward ribs.
Doghouse in place
Hinge blocks and pins
Getting ready to drill
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
495
2357
Avionics
33
180
Empennage
74
222
Engine
35
180
Finishing
93
533
Firewall forward
30
136
Fuselage
117
665
Miscellaneous
3
2
None
1
6
Prop
1
3
Service Bulletins
4
19
Tanks
27
92
Tools
7
11
Wings
70
308
Copyright © 2001-2024 Matronics. All Rights Reserved.