Date:
1-21-2018
Number of Hours:
3.50
Manual Reference:
Brief Description:
Completion of subpanel
Finished wiring the power subpanel and shore power connections. Connectors P200 and P201 are punched in and complete.
Began prep of standoffs for the panel to hold cable anchors so I don't have to use stickons to the back of the GDU460s