KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  12-27-2017
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Power and ground wiring I

Began the installation of the four 8x fuse blocks on the sub panel; the sub panel is dedicated to power distribution. Ran the feed from the master relay to the fuse panel

Installed the "forest of tabs" on the inner firewall and fabricated a jumper from the battery to give it an excellent low impedance ground.
' style=

Starting to install fuse blocks

Starting to install fuse blocks

' style=

FF wiring bundle

FF wiring bundle

' style=

forest of tabs, inner firewall.

forest of tabs, inner firewall.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.