KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  11-25-2017
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Finish GAD27 wiring; start the tray

Completed the wiring to GAD27 and the to termininal block and laced the final bundles. This was a tight fit; if I had to do it over, maybe a different place would be better, though it did minimize the amount of wiring going all the way to the panel.

Began drilling of the avionics tray for the radio/transponder/EIS stack and the connectors that will mate with cables coming up from the aft end
' style=

GAD27 wiring done

GAD27 wiring done

' style=

Initial tray fitup

Initial tray fitup

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.