KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  8-30-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Baggage floor install

Baggage floor is painted ... time to install! I opted for the plans install and used pop rivets rather than than nutplates. The VAF brain trust was divided on which is better and removing pop rivets is quite fast and easy, if needed.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.