Powered By Kitlog Pro v2.0
RV-7
RV-7
All
5-23-2015
< Previous Log Entry
Next Log Entry >
Date:
5-23-2015
Number of Hours:
4.00
Manual Reference:
Brief Description:
SB 14-01-31 Horizontal Stab 1
Waiting for some fuselage rivet help, so I took the time to do the service bulliten for the HS, 14-01-31.
Prepared the new reinforcement brackets and drilled out the rivets holding in the innermost ribs of the HS. Removed the ribs and set aside.
Redy to go
HS before
HS before
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
495
2357
Avionics
33
180
Empennage
74
222
Engine
35
180
Finishing
93
533
Firewall forward
30
136
Fuselage
117
665
Miscellaneous
3
2
None
1
6
Prop
1
3
Service Bulletins
4
19
Tanks
27
92
Tools
7
11
Wings
70
308
Copyright © 2001-2024 Matronics. All Rights Reserved.