KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  2-1-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Riveting brake pedals

Riveted together the brake pedals following priming. This was an easy job with the pneumatic squeezer.

Following riveting, the pedals were fitted to the rudder pedals. I found that he spacing between the mounting horns was a bit tight, and required some bending and other man handling to get them spaced properly for for the install.
' style=

Before

Before

' style=

After

After

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.