KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  11-9-2013
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Riviting the tanks .. 5

Installed and wet-riveted inboard ribs on both the L and R tanks. The hand squeezer worked best of all the tools.

Installed the forward reinforcement brackets.

Safety wired the flop tubes

Installed the vent fitting on inboard rib.

Installed the BNC connectors for the capacitive fuel sensors.
' style=

Nice alignment of the vent tube

Nice alignment of the vent tube

' style=

Safty wired flop tubes

Safty wired flop tubes

' style=

An angel came by to bless the build!  (Eddie Andreni and his P-51, local airshow pilot)

An angel came by to bless the build! (Eddie Andreni and his P-51, local airshow pilot)

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.