Powered By Kitlog Pro v2.0
RV-7
RV-7
All
11-9-2013
< Previous Log Entry
Next Log Entry >
Date:
11-9-2013
Number of Hours:
4.50
Manual Reference:
Brief Description:
Riviting the tanks .. 5
Installed and wet-riveted inboard ribs on both the L and R tanks. The hand squeezer worked best of all the tools.
Installed the forward reinforcement brackets.
Safety wired the flop tubes
Installed the vent fitting on inboard rib.
Installed the BNC connectors for the capacitive fuel sensors.
Nice alignment of the vent tube
Safty wired flop tubes
An angel came by to bless the build! (Eddie Andreni and his P-51, local airshow pilot)
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
495
2357
Avionics
33
180
Empennage
74
222
Engine
35
180
Finishing
93
533
Firewall forward
30
136
Fuselage
117
665
Miscellaneous
3
2
None
1
6
Prop
1
3
Service Bulletins
4
19
Tanks
27
92
Tools
7
11
Wings
70
308
Copyright © 2001-2024 Matronics. All Rights Reserved.