KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  12-23-2012
Number of Hours:  3.50
Manual Reference:  
Brief Description:  HS completion

Built a tool to push the flang back into position for the installition of the pop rivets. I was able to inert a stick that pushed on the flange on one end and the forward spar on the other… making the hypotenuse of a triange between the rib and the forward spar, at a small angle between the the stick and the rib. This was pushed into positon, held in with a long stick and wedge in the open area between the HS halves, then the rivet was popped. Worked great .. and didn't have to remove the skin to fix

!
HS complete! 38.3 hrs"
' style=

HS complete

HS complete

' style=

Reverse angle

Reverse angle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.