Date:  8-8-2011
Number of Hours:  2.00
Manual Reference:  SNX-T01
Brief Description:  Tail surface installation

Spent more time working at getting the elevator controls set to the right angles. The elevator needs to be set for 20 deg down and 25 deg up. This is area that seems to require a lot of trial and error to get right.