KitLog pro

Powered By Kitlog Pro v2.0

Sonex N367SX
' style=
Date:  5-31-2011
Number of Hours:  1.50
Manual Reference:  SNX-L01
Brief Description:  Motor mount and landing gear

Adjusted the landing gear axles at a 7 deg toe-in by using a 3/4 inch spacer on the inside of the axle. Once everything was locked into place and double checked, I used a drill to mark the hole that need to be drilled in the landing gear rods. I removed the rods and now ready to drill the final two holes.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.