Powered By Kitlog Pro v2.0
WAYNE'S WEB SITE
RV 7A
All
6-24-2008
< Previous Log Entry
Next Log Entry >
Date:
6-24-2008
Number of Hours:
8.00
Manual Reference:
Brief Description:
Fuel system
Confirmed fuel flow sensor operation and drain tanks for weighing. Install floor pan, rework engine baffling for fiberglas scoops, installed adel clamps on fuel lines inside of cockpit, install o-rings around fuel lines coming trhough fuselage, adel clamped scat tubing under cowling.
Checking fuel flow sensor
Flexible fuel lines
Rework seals for scoops
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV 7A Home
Category
# Logs
# Hours
All
246
1514
Avionics
39
244
Empennage
22
149
Engine
30
258
Flight testing
3
17
Fuselage
92
474
interior
1
4
Miscellaneous
31
238
Shop Supplies
1
2
Wings
27
128
Copyright © 2001-2024 Matronics. All Rights Reserved.