Yeah, Jeff has the avionics proof done so I can see how everything fits. Looks like everthing needs to be shifted .4 " as well as some holes need to be changed. The standard circuit breakers are .45" and the switched pulled circuit breakers need to be .375". I'm starting to get excited seeing the panel punched.