Brief Description: final assembly/weight and balance
8/31 2 Painted spinner and trim tab Finished seat clearancing 9/1 2.5 Wiring and hardware finish work 9/2 2 Pilot test c/w 3 knots lost in one min Sanded and buffed spinner Found CHT#1 issue 9/3 3 Sanded and buffed canopy frame 9/4 2 Worked on scratch removal on canopy Installed new Regulator and test ran engine 9/28 1 Fixed CHT 1 wiring Ran new power wire to EMS 9/29 2 Wirind cleanup Canopy scratch removal Installed new air inlet duct 9/30 2 Finished canopy cleanup Buffed fronk deck Put everything together, ready for the airport!!!!!!!!!! Fuel flow test complete-5 gals 16:20 at 16 deg nose high equals 18.4 gph 10/1 .5 Installed data plate 10/2 .5 Moved plane to hangar 10/3 1.5 Bolted wings on fuselage 10/4 2 Buffed right wing Installed right aileron 10/5 3 EFIS/EMS programming Wrote POH and filled out forms 10/6 1.5 Buffed left wing Took measurements for W&B prep 10/10 5 Misc from past couple days Found fault in carburetor, need new one 10/11 3 Re adjusted starter Ran wiring for speed brake indicator Worked on aileron final balance Aileron rigging Found fuel leak on right wing tank vent Need to reinforce speedbrake mount 10/12 3 Worked on aileron geometry 10/13 1 Drilled right and left aileron brackets and installed nut plate for control rod 10/17 3 Worked left aieleron control rod clearance Transferred parts to new carb bowl Worked on right fuel tank leak 10/18 4 Finished new carb install Finished aileron linkage clearance Engine run testing Taxi testing Wired new Ammeter shunt 10/19 1.5 Removed oil/fuel pressure sensors Started working speedbrake reinforcement 10/20 1.5 Finished cutting wood for speedbrake Wiring cleanup 10/21 1.5 Glued in speedbrake supports Misc cleanup Shop cleanup 10/22 3 Varnished speedbrake support Found fuel leak in left tank vent Sealed leak Wired new oil and fuel sender Fixed Ammeter Made new aileron pushrods Installed aileron gap seal Tightened elevator cables 10/23 1 Added clamps to fuel lines Inst