4/23 3 cut left stub trailing edge. Flipped plane upright. Made template for forward deck. 4/24 3 cut, glued and sanded forward deck foam 4/25 2 glassed forward deck. Cut and clamped pitot hose 4/26 3 cut and secured piano hinge to forward fuselage. Glassed inside of forward deck and microed onto hinges. 4/27 3 added fiberglass over plywood still on forward deck and re-secured upper hinge. Sanded and varnished inside fuselage area behind shelf. 4/30 3 floxed hinge halves to forward deck and fuselage. Cut instrument panel to fit. Clamped and floxed pitot/static tubes and ran hose to cockpit. 5/1 1 test fit canopy to figure out required headroom 5/2 1 sanded inside rear fuselage and applied second coat of varnish