Brief Description: So much sanding, and engine work
4/28 4 Worked on carb heat box and carb intake Finished carb heat box Worked on front cowling hinge 5/1 4 Microed cowling and fuselage Mounted remote elt Worked on carb intake 5/4 5 Sanded left fuselage and cowling Cut/drilled and riveted baffling Started installing silicone baffle material 5/5 2 Sealed up around baffling Finished bearing oil line pass through 5/6 2 Microed right stub wing Sanded vertical stab