KitLog pro

Powered By Kitlog Pro v2.0

Christophers Web Site
' style=
Date:  5-13-2017
Number of Hours:  19.80
Manual Reference:  
Brief Description:  Left fuel tank

5/3 3 temp installed top with duct tape as a release and glassed two layers of 2" tape on all edges
5/4 1 more fuel tank glassing
5/5 1.5 glassed last top portion and center rib cutouts. Bottom ready for permanent install
5/7 3 glassed bottom and all corners
5/8 2.5
-finished up a couple spots that needed attention
- cut hole for fuel pickup and started making line
5/9 2
-finished fuel pickup and bracket
-soldered new wires to fuel sender
-floxed fuel line and sender into tank
5/10 1.3
-floxed vent line in
-glued two top panels in and made nose blocks
5/11 2
-filled tank with gas to leak check
- fuel sending unit not working right, tried to unstick
5/12 2
-made longer fuel float arm to fix problem and reattached unit
- fixed one minor leak and leak checked again
- floxed top of fuel tank on
5/13 1.5
- fixed three leaks found on top
- leak checked again, found another leak....repaired.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.