10/30 3.5 -Leveled fuselage and lined up engine mount about 15 times. -Drilled holes for mount -installed fiberfrax and rough cut stainless steel 11/1 1 fit and drilled stainless steel for engine mount 11/3 1 installed engine 11/5 2 cleaned up shop and started fitting cowling to figure it out 11/6 1.5 -set electrical/fuel components around to figure out locations -drilled hole for fuel line in firewall -mounted ignition coils and msd switch 11/10 1 mounted battery pass through and master solenoid 11/24 4 made some battery wires. Mounted oil cooler, oil catch can, voltage regulator, fuel pumps and gascolater. 11/25 1 installed radio in panel. 11/26 2 drilled and installed control knows, and switches in panel 11/27 1 ran some wiring behind panel