2/18 1.6 made left tail wheel cable and started on right side 2/19 2 finished tailwheel cables. Deburred rudder pedals and bellcranks. Started working on elevator rigging 2/21 2.5 made a couple elevator brackets and a push rod. Started running cable 2/22 1.2 finished lower elevator cable and started upper. Finished cutting aileron pulley brackets, deburred and painted. 2/23 1 made two brackets for elevator system. 2/24 1.4 made elevator counterweight parts and installed aileron pulley brackets with cable guards 2/27 2.5 drilled, painted and riveted control rods. Mounted elevator control brackets and made last cable.