KitLog pro

Powered By Kitlog Pro v2.0

Christophers Web Site
' style=
Date:  6-2-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Elevator glassing

I finished glassing the left elevator today. I started by removing 1" of the foam at the trailing edge. Then I used the plastic layup method to cut and wet out the KR cloth with a piece of deck cloth on top. After the glass was wet out, I microed the foam, filled in the 1" void with cotton flox and layed on the glass.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.