Date:  6-14-2009
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Electrical

After much debate, we decided it was time to start completing aircraft from tail forward, ground up. Removed baggage floor. Drilled additonal wiring access holes and installed snap bushings. Ran wiring for elevator trim, strobes and position lights. Ran strings through remaining bushings.