Powered By Kitlog Pro v2.0
Demoted Priority
RV-8
All
4-27-2009
< Previous Log Entry
Next Log Entry >
Date:
4-27-2009
Number of Hours:
8.00
Manual Reference:
Brief Description:
Andair Fuel Valve
Fabricated brackets for the Andair Fuel Valve and began fabbing the fuel lines.
Assembled the interior as much as possible to show it off to a friend.
The instruments aren't real. Just a print taped to the panel.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
75
588
Empennage
31
161
Engine
1
Firewall Forward
3
8
Fuselage
32
206
Goodies
2
Instrument Panel
2
202
Interior
1
3
Quick Build Kit
2
Wings
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.