Powered By Kitlog Pro v2.0
Our 650
CH 650 B
All
11-5-2014
< Previous Log Entry
Next Log Entry >
Date:
11-5-2014
Number of Hours:
1.50
Manual Reference:
6-T-3B
Brief Description:
Elevator horn doublers
Trimmed and drilled doubler angle 65T3-7. Layed out drill marks on doubler 65T3-6 and setup to drill both together.
Also deburred holes for the elevator on the elevator side.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH 650 B Home
Category
# Logs
# Hours
All
28
71
Empennage
25
64
Miscellaneous
2
2
Wings
1
5
Copyright © 2001-2024 Matronics. All Rights Reserved.