Powered By Kitlog Pro v2.0
Our 650
CH 650 B
All
10-18-2014
< Previous Log Entry
Next Log Entry >
Date:
10-18-2014
Number of Hours:
3.50
Manual Reference:
6-T-3B
Brief Description:
Elevator hinge work
Pops and I layed out, marked and drilled the piano hinge for the elevator/horizontal stab. Fit was good and operated smoothly. Pops then deburred all the new holes and the hinge.
Test fitting the elevator to Horizontal Stab
Drilled the hinge on the elevator side
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH 650 B Home
Category
# Logs
# Hours
All
28
71
Empennage
25
64
Miscellaneous
2
2
Wings
1
5
Copyright © 2001-2024 Matronics. All Rights Reserved.