KitLog pro

Powered By Kitlog Pro v2.0

Davids Pipistrel Build Website
' style=
Date:  2-25-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Extended the front air scoop for air cooling the e

I didn't like how far away the factory air scoop was from the cowl. The foam would probably fold back due to air pressure so I cut out some graphite fabric and mixed some epoxy and extended the air scoop
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.