KitLog pro

Powered By Kitlog Pro v2.0

Davids Pipistrel Build Website
' style=
Date:  4-17-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Installed brake lines in cockpit

Drilled holes in cockpit floor for brake lines, Connected brake lines between parking brake and copilot pedals. Then connected lines between copilot pedals and pilot pedals. Tried lots of different configurations and line lengths to get a combination that didn't interfere when moving pedals back and forth. decided on running both lines between the two pedals over the nose gear cable cover rather than under it.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.