Powered By Kitlog Pro v2.0
ULAY'S WEB SITE
RV-10
Empennage
6-12-2018
< Previous Log Entry
Next Log Entry >
Date:
6-12-2018
Number of Hours:
8.00
Manual Reference:
Section 9
Brief Description:
Building elevators
Separated elevator ribs and shear clips. Drilled the tip rib assemblies and dimpled the elevator skins. Drilled the hinge reinforcement plates, marked, deburred. Final drilled, deburred and back riveted ribs to skins.
Dimpling elevator skins
Installing hinge reinforcement plates
Back riveting ribs
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
91
476
Avionics
1
4
Empennage
59
318
Fuselage
25
118
Modifications
6
36
Copyright © 2001-2024 Matronics. All Rights Reserved.