KitLog pro

Powered By Kitlog Pro v2.0

ULAY'S WEB SITE
' style=
Date:  3-16-2019
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Antenna doubler installation under baggage floor

Installed ADS-B in and out antenna doublers for access thru the baggage door access panels. These panels also serve to provide access to the step bolts should they ever need to be tightened or replaced.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.