Powered By Kitlog Pro v2.0
ULAY'S WEB SITE
RV-10
All
6-19-2018
< Previous Log Entry
Next Log Entry >
Date:
6-19-2018
Number of Hours:
8.00
Manual Reference:
Section 9-18
Brief Description:
Match drilling the trim tab hinge
Match drilled both elevators trim hinges and riveted as per plan. Fabricated and installed the elevator counter weights on both elevators.
Match drilling trim hinge.
Fabricating and installing elevator counter weights
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
91
476
Avionics
1
4
Empennage
59
318
Fuselage
25
118
Modifications
6
36
Copyright © 2001-2024 Matronics. All Rights Reserved.