Brief Description: Left fuel tank/Right Z-brackets
Left fuel tank was final drilled to baffles and joint plate. Clecoed left fuel tank skin to ribs and baffle and removed for final drilling. Started Z-Bracket drilling for right fuel tank.
Left fuel tank assembled for final drilling
Another view of left assembled fuel tank showing Z-Brackets