KitLog pro

Powered By Kitlog Pro v2.0

Terry Wighs
' style=
Date:  6-2-2007
Number of Hours:  16.00
Manual Reference:  
Brief Description:  Paint booth fabrication/design

Paint booth is 7ft X 19ft. X 7.5ft height.The roof of the booth is actually suspended from the ceiling wtih chains connected to the joists. The ends are removeable intact panels. The long side curtains are simply rolled up and stored on top the the paint booth roof when not in use. I am able to open the garage door if needed because of careful chain placement on the ceiling frame. The air into the booth is filtered and pulled in by a box fan. The booth can be disassembled after use in about 15 minutes. The overlapping tent corners are secured tightly with three two inch spring clamps per corner.
This size was designed to allow painting of all parts, including the wings, and eventually the fuselage as well. I will be painting the kit parts as I proceed through the process.
' style=





' style=

Alodine prepared piece of scrap aluminum ready for primer.

Alodine prepared piece of scrap aluminum ready for primer.

' style=

On the end is a box fan bringing in air and passes through a furnace filter.

On the end is a box fan bringing in air and passes through a furnace filter.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.