Powered By Kitlog Pro v2.0
Terry Wighs
RV-8
All
3-1-2010
< Previous Log Entry
Next Log Entry >
Date:
3-1-2010
Number of Hours:
1.00
Manual Reference:
Brief Description:
Drilling out landing tail gear
Drilled out the tail landing gear flange with aft Bulkhead, and deburred and drilled out baggage sub assembly and bell crank ribs.
Tail Landing Gear Drilled Out
Tail and Baggage/Bell Crank Parts Deburred
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
527
1215
Avionics
1
1
Electrical
15
23
Empennage
92
252
Fuselage
214
474
Instrument Panel
6
11
Shop Supplies
1
Tools
4
2
Tools/Shop
6
19
Wing Craddle
1
4
Wings
187
429
Copyright © 2001-2024 Matronics. All Rights Reserved.