Continued work on the wing tip and the reworking the rivets on the left wing. I'll soon start the electrical and pito static installation. First I'll clean all the rivets shop heads and give them a nice coat of AKZO primer for protection. Then I'll get an inspection from EAA chapter Tech advisor and with any luck close the left wing and move to the right wing. Once both wings are in the same stage i'll build the Fuselage fixture and begin that construction.