KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  12-15-2007
Number of Hours:  2.50
Manual Reference:  Chapter 7
Brief Description:  Final prep

Final prep for the tank installation on the right wing. Primed the bottom skin and flange. Primed the end lower flange and skin. This will help prevent corosion on the skin to leading edge connection. Set the wing on the spar. Found the top joint to be to tight. When the bottom joint was up tight the top skin was over lapping the leading edge. Took the tank off and filed the tank skin down about .008 inches. refit the tank and the joint looks great. Bolted and screwed the tank on. Ready to start riveting the top skin on.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.