KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  7-1-2007
Number of Hours:  0.50
Manual Reference:  Chapter 7
Brief Description:  Right Tank Construction

Removal of the leading edge to drill the tip side attach bracket to the rear baffel. Image 1 is the removal of the clecos from the leading edge skin and joint plate.
Image 2 Leading edge to tank removal. After the drilling of the joint plate to tank.
Image 3 Exposure of the joint plate still attached to the tank skin.
' style=

Cleco removal

Cleco removal

' style=

leading edge seperation

leading edge seperation

' style=

Leading edge removal

Leading edge removal

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.