Riveted F866A plate nuts which attach the baggage floor to the bulk head. Also riveted the F870B stiffner and plate nuts to the baggage floor. I'm looking at making a section of Floor to cover the drop to the cabin floor in the baggage area. I think the area under the baggage area on the right side can be better used as an electronic/electrical location.