KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  9-6-2014
Number of Hours:  2.50
Manual Reference:  Chapter 8
Brief Description:  installed Flap Motor

Installed the Flap Motor. Tested the operation and drilled the WD406 attach point to the F807 bulkhead. Works great, first part of the aircraft that moves. Used my electrical control box to activate the motor. I may need to accomodate the 12V motor because I'm planning on using a 24V system.
' style=

Temp set up clamped

Temp set up clamped

' style=

Drilled #40 holes

Drilled #40 holes

' style=

Final drill #12

Final drill #12

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.