Primed the F819 back deck and all the brackets and spacers to install the aft deck. Also primed the tail tie down after drilling the hole in the aft bulk head F812 for position light wire installation. Reset a few rivets in the aft compartment as they were not set enough. Touched up the primed interior of the aft comportment F812 to F810 bulk heads. The only component needed is the F812B bracket as I'm waiting for material from Vans. This will not be installed until the empanage is installed so I can move forward with the permenant installation of the aft deck F819.