Continued work on the floor installation plate nuts. Manufactured the flap bearing blocks and drilled the floor for the installation of the flap weldment and bearing blocks. created a shim for the forward foot well attachemetn to F804. I had a choice either I drill out the bracket rivets or shim the floor by 1/6" inch. I chose to not drill out the rivets and make a shim. Picture shows rear cabin floor installed.