Powered By Kitlog Pro v2.0
THOMAS'S WEB SITE
RV8A
Fuselage
10-1-2013
< Previous Log Entry
Next Log Entry >
Date:
10-1-2013
Number of Hours:
0.50
Manual Reference:
Brief Description:
Cabin Floor
Drilled aft right plate nuts holes. Will be doing the mid cabin and possibly the fwd floor tonight. after all plate nuts have been drilled and dimpled or counter sunk the mid cabin side skins will be installed perminantly.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
553
1066
Electrical Component
20
69
Empennage
7
19
Fixtures
12
41
Fuel Tanks
46
60
Fuselage
387
743
Miscellaneous
3
3
Shop Organisation
10
1
Tools
8
10
Wings
60
120
Copyright © 2001-2024 Matronics. All Rights Reserved.