Date:  8-28-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Cabin Floor

Continued work on the plate nuts for the cabin floor. counter sunk plate nuts into the F814 F815 aft portion of the cabin floor. installed 1/2 of the plate nuts.