Installed the baggage floor, drilled the side walls to the floor and placed into position. Cut and shaped the rear shelf and rear bulk head cover. Looks to me that a few stiffners should be installed on the rear shelf and possible the face of the shelf asymbly for make everything a little more rigid. Need to continue to drill and then dimple and install plate nuts for the bagage area.