Powered By Kitlog Pro v2.0
THOMAS'S WEB SITE
RV8A
Fuselage
11-10-2012
< Previous Log Entry
Next Log Entry >
Date:
11-10-2012
Number of Hours:
3.00
Manual Reference:
Brief Description:
Cabin Floor
Drilled the aft floor panels in position and the foot well's. The angle on F804 I instlled .063 to low and I'll need to make a spacer for the floor to be the correct hight. The foward floor is screwed in so this will not be a problem.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
553
1066
Electrical Component
20
69
Empennage
7
19
Fixtures
12
41
Fuel Tanks
46
60
Fuselage
387
743
Miscellaneous
3
3
Shop Organisation
10
1
Tools
8
10
Wings
60
120
Copyright © 2001-2024 Matronics. All Rights Reserved.