Powered By Kitlog Pro v2.0
THOMAS'S WEB SITE
RV8A
Fuselage
11-1-2012
< Previous Log Entry
Next Log Entry >
Date:
11-1-2012
Number of Hours:
1.00
Manual Reference:
Brief Description:
Cabin Floor
Trimmed the bulk head flanges on the right side. took two iterations and the clearance in good. The floor panel needs trimming at the bulk heads to allow clearance. Stiffners for both sides have been drilled dimpled and alodined.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
553
1066
Electrical Component
20
69
Empennage
7
19
Fixtures
12
41
Fuel Tanks
46
60
Fuselage
387
743
Miscellaneous
3
3
Shop Organisation
10
1
Tools
8
10
Wings
60
120
Copyright © 2001-2024 Matronics. All Rights Reserved.