Powered By Kitlog Pro v2.0
Tom's Web Site
Bearhawk
All
4-6-2013
< Previous Log Entry
Next Log Entry >
Date:
4-6-2013
Number of Hours:
4.00
Manual Reference:
Brief Description:
Three Insert Panel
Panel - three cutout outs.
1 - putting router to use (CNC)
2 - rapid prototype to check size, layout. Flange area too small, so good to use $4 wood and not $25 aluminum panel (6061-T6-0.050)
3. Once I was was happy with size, placement, etc. Added fingers (3/4" x 3/4" is fine). CNC routed MDF as a quick hammer form. Then form over flanges.
Cutting prototype from wood
Checking for size, form, function
Added flange to be hammered over
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
156
422
Avionics
1
Electrical System
5
11
Empennage
10
22
Engine
3
6
Floobydust
1
Fuel System
16
48
Fuselage
79
288
Miscellaneous
9
5
None
2
Panel
2
4
Panel
7
29
Sport Air Workshop
3
Stewart Systems Work
1
Tools
14
6
Wings
2
3
workshop
1
Copyright © 2001-2024 Matronics. All Rights Reserved.