KitLog pro

Powered By Kitlog Pro v2.0

Tony's RV-6A Web Site
' style=
Date:  1-20-2023
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Rudder cable

- Bent the second fabricated rudder cable fairing and cut the cable exit slot in the fuselage
- Located, drilled, primed, painted, and riveted pilot side cable fairing in place
- Installed adel clamp on interior to hold the cable sleeve and installed the recommended hardware through the cable fairing and fuselage to hold the adel clamp in place
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.