Powered By Kitlog Pro v2.0
Anthonys Web Site
RV8A
Empennage
10-10-2012
< Previous Log Entry
Next Log Entry >
Date:
10-10-2012
Number of Hours:
3.00
Manual Reference:
Brief Description:
trial fitted elevators - trim motor wiring
Drilled a hole in the elevator front for the trim motor wiring to exit.
Put the trim motor back into the trim tab and secured it.
Trial fitted both elevators.
Checked the vertical stab position with a laser light aligned with the canopy rail. Perfect.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
559
1548
Avionics
101
342
baffeling
40
104
canopy
89
236
canopy
45
112
cowl
50
137
electrical
10
24
Electrical
58
180
Empennage
12
35
Engine
5
7
Firewall Forward
89
236
Fuselage
31
64
General
3
4
Instruments
2
4
Miscellaneous
2
6
panel
13
44
Shop Supplies
1
1
Systems
8
12
Copyright © 2001-2024 Matronics. All Rights Reserved.