KitLog pro

Powered By Kitlog Pro v2.0

Anthonys Web Site
' style=
Date:  9-28-2012
Number of Hours:  1.50
Manual Reference:  
Brief Description:  preparing to bolt the HS and VS on the airframe

The hardware I ordered from Aircraft Spruce arrived and I took it to the hangar where I determined the callout of all fasteners for the horizontal and vertical stabs. I put the bolts and washers in place and started the nuts on them, even those on the forward HS spar which are very difficult to get to.

It is ready to be torqued which will require two people. Stefan King is coming by to help with that.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.