Powered By Kitlog Pro v2.0
Anthonys Web Site
RV8A
All
4-18-2010
< Previous Log Entry
Next Log Entry >
Date:
4-18-2010
Number of Hours:
2.50
Manual Reference:
Brief Description:
doublers, retention clips
Fabricated and riveted the doublers for all the 8 places where the wires that attach the front and back baffles connect to the baffle pieces.
Fabricated the second retention clip and drilled them onto the baffle pieces.
Renewed the dissident plugs.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
559
1548
Avionics
101
342
baffeling
40
104
canopy
89
236
canopy
45
112
cowl
50
137
electrical
10
24
Electrical
58
180
Empennage
12
35
Engine
5
7
Firewall Forward
89
236
Fuselage
31
64
General
3
4
Instruments
2
4
Miscellaneous
2
6
panel
13
44
Shop Supplies
1
1
Systems
8
12
Copyright © 2001-2024 Matronics. All Rights Reserved.